杏耀平台登录入口,杏耀平台代理注册,杏耀平台娱乐登录,杏耀平台登录地址

CLIMAVENETA

Projects APPLICATION
▶ locations:Home>Projects
CLIMAVENETA

Linyi Medical College Affiliated Hospital of Shandong Province

Area:Shandong System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:1170kW Heating Capacity:1215kW

Project:

The project of the Affiliated Hospital of Shandong Medical College adopts modular air-cooled heat pump (cold water) units with a total cooling load of 1170kW and a total heat load of 1215kW

Installed Units:

2X AQS130M-N 7X AQS130S-N

Solution:

Using air cooling module system, cooling in summer, heating in winter, saving the configuration of cooling water pump and cooling tower. The unit adopts environmental protection refrigerant, which does not pollute the environment

Certification:

Projects

APPLICATION
Projects

Linyi Medical College Affiliated Hospital of Shandong Province

Area:Shandong System Type: Construction Area: Application Type:Healthcare / Hospitals Cooling Capacity:1170kW Heating Capacity:1215kW

Project:

The project of the Affiliated Hospital of Shandong Medical College adopts modular air-cooled heat pump (cold water) units with a total cooling load of 1170kW and a total heat load of 1215kW

System Type:

Installed Units:

2X AQS130M-N 7X AQS130S-N

Solution:

Using air cooling module system, cooling in summer, heating in winter, saving the configuration of cooling water pump and cooling tower. The unit adopts environmental protection refrigerant, which does not pollute the environment

Certification: